Archive for the ‘waste’ Category

“Rewalk Meetings” sabatoge our reputation

Posted by: JC Gatlin on March 13, 2011

FTQ’s Most Wanted: $238.75 Caulking Issues

Posted by: JC Gatlin on March 9, 2011

PDCA of the Month – “Dirt Piles” – February 2011

Posted by: JC Gatlin on March 3, 2011

Motion Waste: 10 Examples on the jobsite

Posted by: JC Gatlin on February 23, 2011

The 7 Wastes on the Construction Site

Posted by: JC Gatlin on June 27, 2010

Forced Cost Reduction is not Waste Elimination

Posted by: JC Gatlin on March 28, 2010

Construction Cost Reduction starts on the jobsite

Posted by: JC Gatlin on March 21, 2010

Closing Exception Letters = Overdraft Protection

Posted by: JC Gatlin on February 28, 2010

The Cost of 2nd Time Quality

Posted by: JC Gatlin on January 31, 2010